Back to Services

repair

UV CIPP Point Repairs

Structural sanitary sewer pipe repair in minutes—not months.

Cure-In-Place Pipe (CIPP) point repair for commercial and residential sanitary sewer defects for pipes ranging from 4 – 12-inch diameter.

What This Service Is

Understanding UV CIPP Point Repair

Center Line Locating, LLC is now LightRay Certified to perform Cure In Place Pipe (CIPP) repairs, providing fast, structural trenchless repairs for 4" - 12" sanitary sewer lines. This UV-cured, fiberglass-resin allows us to structurally repair pipe defects, reducing restoration costs, minimizing surface disruption, and completing repairs quickly. It’s an ideal solution for cracks, joint failures, root intrusion, and other localized damage. With our CCTV, cleaning, and trenchless repair capabilities, we can inspect and rehabilitate in one streamlined process, helping keep your projects on schedule and within budget.

UV CIPP Point Repairs

Why It Matters

The importance of UV CIPP Point Repairs

This UV-cured, fiberglass-resin allows us to structurally repair pipe defects, reducing restoration costs, minimizing surface disruption, and completing repairs quickly.

Minimal Disruption – No major digging or excavation, keeping your property, operations, and landscaping intact.

Fast Turnaround – Repairs are completed in hours instead of weeks or months.

Cost-Effective Solution – Eliminates the high costs associated with traditional open-cut repairs and restoration.

Long-Lasting Durability – Structural liner creates a strong, reliable repair backed by 10-Year Warranty. 50-Year Design Life Based on ASTM F1216 Standard and Long-Term Creep ASTM D2990 Standard.

What You Get

Deliverables & Outcomes

UV Liner Structural Point Repair
Cures in minutes and operable in hours
Minimal distruption to property
10 year product warranty and 50 year design life

How We Work

Our Process

01

CCTV Inspection

We perform a pre-repair camera inspection to identify pipe defects and determine the repair needed.

02

Clean & Prep

High-pressure jetting and descaling remove debris, roots, and buildup so the pipe is ready for repair.

03

Field Work

UV-cured fiberglass resin liner is installed to structurally reinforce the pipe defect in minutes.

04

Documentation

A post-repair NASSCO certified CCTV inspection report documents the completed CIPP repair.

Ready to Get Started?

Contact us to discuss your uv cipp point repairs needs. We'll help you get the accurate utility data you need.